At Emmanuel Church Islamabad Church, we strive to create a welcoming and inclusive community for all. Our mission is to spread the love and teachings of Jesus Christ while fostering a sense of belonging and fellowship among our members. We offer a wide range of programs and services, including Sunday worship, Bible studies, youth groups, and community outreach initiatives. Come join us and experience the warmth and love of Emmanuel Church Islamabad Church!
Building on the initial plan, here is the detailed budget and international engagement strategy for Emmanuel Church in Islamabad.
1. Estimated Construction Budget (2025-2026 Rates)
Based on current construction trends in Islamabad, costs are divided into "Grey Structure" (the shell) and "Finishing."
Category Estimated Rate (PKR / sq. ft.) Estimated Total (for ~10,000 sq. ft. build)
Grey Structure 2,500 – 4,000 PKR 25M – 40M ($90k – $145k)
Standard Finishing 4,500 – 6,000 PKR 45M – 60M ($160k – $215k)
Premium Finishing 6,500 – 8,000+ PKR 65M – 80M ($230k – $285k)
Note: The twin towers and specialized brickwork for the portico will likely push the design into the "Premium" bracket due to the structural engineering required for height.
Key Material Costs (approx. as of 2026):
- Cement: PKR 1,250 – 1,350 per bag.
- Steel: PKR 275,000 – 285,000 per ton.
- Bricks: PKR 16 – 18 per brick.

Copyright © 2026 Emmanuel Church Islamabad - All Rights Reserved.
Powered by uk 🇬🇧 webspace